Box truss, triangle truss, and ground support structures sized and engineered for your specific room and load. Truss rental includes the engineering that says it will hold, not just the aluminum.
Certified motor packages for flying lighting, video, and audio, with every point planned against a full engineered load chart before anything is hung.
Detailed rigging plots and load calculations completed in advance, so your venue and its safety inspector sign off ahead of show day instead of holding up your load-in.
Certified riggers on site to install, inspect, and strike the rigging package, on the schedule the venue gave you.
Any company can hang a point. The difference is whether somebody calculated the load, checked it against what the building can carry, and documented it before the crew arrived. Ask a rigging quote three questions: who does your load calculations, what certification do your riggers hold, and when does the venue see the rigging plot. Vague answers on any of those are the answer.
| General session | Breakout rooms | |
|---|---|---|
| Typical load | Line arrays, LED wall, full lighting rig | A few fixtures, a small screen |
| Rigging approach | Engineered points, motors, full plot | Often ground support instead of flown |
| Venue involvement | Rigging plot and load approval required in advance | Usually lighter, but ceiling limits still apply |
| Where it goes wrong | Assuming the ceiling grid has capacity it does not | Assuming small loads need no plan at all |
Breakout rooms are where corners get cut, because the loads look trivial next to the main room. Ceiling structures in breakouts are frequently weaker than in the ballroom, and a hotel’s own limits often say so in writing. The plan scales down. It does not disappear.
More depth on each of these: why professional rigging matters, rigging general sessions against breakout rooms, and truss for corporate events.
Calculations and a rigging plot produced before anything is booked.
We confirm rigging points, capacity, and access with the building directly.
Install, inspection, and strike by the people who planned it.
The gear, with its inspection and certification current.
Down on the venue's clock, documented the same way it went up.
The reveal depended on an LED enclosure lifting cleanly off the trucks on a single cue, in front of a live trade show audience. The rigging had to hold 288 LED panels for two days of show hours, then move them on command without hesitation.
Twelve one-ton high-speed motors on a Kinesys automation system, with the structure engineered around a 360-degree enclosure rather than a flat hang.
The enclosure held through two days at the 2018 Work Truck Show and lifted on cue on day three in front of more than 2,000 spectators.
The crew on the ground from load-in through strike.